Bathroom questions

How much does a bathroom remodel cost in the Bay Area?

The honest answer has three numbers, not one. Here is where our prices start, what pushes them up, and what to look for in any contractor's estimate.

Aleksei Kasatkin, owner of ORCA Build Group · Updated October 26, 2026

Short answer With us, a tub-to-shower conversion starts at $12,500, a full remodel that keeps the layout starts at $25,000, and a remodel that moves plumbing or a primary bathroom starts at $40,000. Those prices include demolition, haul-away, labor and mid-grade materials.

Where the price starts

These are the starting points from our current price list. Each one is all-in: demolition, haul-away, labor, and mid-grade materials written into the estimate as named allowances.

Tub-to-shower conversion, layout staysfrom $12,500Full remodel, layout staysfrom $25,000Plumbing moved, or a primary bathroomfrom $40,000
Where our prices start. Each figure includes demolition, haul-away, labor and mid-grade materials. Bar length is to scale.

"Starts at" means a typical hall bathroom of about 5 by 8 feet with no surprises behind the walls. A larger room or a longer materials list moves you up from there.

What makes the number go up

Most of the difference between two bathrooms of the same size comes from five things.

  • Moving plumbing. Shifting a toilet, drain or shower valve means opening the floor or walls, a permit and inspections. Keeping fixtures where they are is the biggest single saving.
  • What is behind the tile. Old leaks often leave soft subfloor or rotted framing. Nobody can price that from photos, so a good estimate says how it will be handled before demolition starts.
  • Tile and layout of the tile. Large-format porcelain, patterned layouts and full-height walls take more labor per square foot than a simple wainscot.
  • The shower enclosure. Frameless glass is custom-measured after the tile is done and is one of the larger single line items.
  • Electrical upgrades. New lighting circuits, a heated floor or a relocated fan add a licensed electrician's time and, usually, a permit.
What nobody can price from photos: a primary bathroom after demolition, with the old tub deck open (left) and the drains and supply lines exposed in the wall (right).What nobody can price from photos: a primary bathroom after demolition, with the old tub deck open (left) and the drains and supply lines exposed in the wall (right).
What nobody can price from photos: a primary bathroom after demolition, with the old tub deck open (left) and the drains and supply lines exposed in the wall (right).

What a fair estimate shows

A low total is easy to write. What protects you is detail. Before you compare numbers, check that each estimate shows:

  • The scope room by room, including what is excluded.
  • Allowances for tile, vanity and fixtures as dollar amounts, so you know what "included" buys.
  • How hidden damage is handled: what gets photographed, how it is priced, and that work stops for your approval.
  • The schedule and the payment stages tied to finished work, not to dates.

Our written estimates are a fixed price and hold for 14 days. If we find rot behind a wall, I send photos and a price before anyone continues. You can read more in How to compare remodeling estimates.

Ways to spend less without cutting corners

  • Keep the toilet, vanity and shower where they are.
  • Use one tile for the floor and shower walls, or tile the shower only and paint the rest.
  • Choose a standard-size vanity instead of a custom one.
  • Decide on every fixture before work starts. Changes made mid-job cost the most.

What I do not recommend cutting: the waterproofing membrane, the fan, and the slope of the shower floor. Those are the parts you cannot fix later without tearing out new tile.

The same bathroom finished: freestanding tub, double vanity, large-format porcelain floor.
The same bathroom finished: freestanding tub, double vanity, large-format porcelain floor.

Do you give free estimates?

Yes. Send 2 or 3 photos of the room and your city, and I reply with a realistic range. After a site visit you get a written fixed-price estimate at no charge.

Why are Bay Area prices higher than national averages?

Labor, permits and disposal all cost more here, and many homes are old enough that some repair work behind the walls is likely. National cost guides usually do not include those.

Related questions

Codes and permit rules change, and each Bay Area city applies them a little differently. Treat this page as a starting point and confirm the requirements for your address before work begins. We do that as part of every written estimate.

Have a bathroom question this page did not answer?

Send 2–3 photos and tell me what bothers you about the room. I reply with a price range and what I would check first.

Call Text Free estimate